Oil Gas and Petrochemical Test Equipment Calibration — API MPMS ISA

Oil, Gas & Petrochemical

ISO/IEC 17025:2017 accredited calibration, repair, and sales / rentals of pressure transmitters, gas detectors, flow computers, and process-loop instruments for API-MPMS, ISA-95, and refinery safety programs · ANAB Certificate AC-1736

Oil, Gas & Petrochemical Services

Techmaster Electronics serves upstream / midstream / downstream operators, custody-transfer measurement teams, refinery instrument shops, chemical plant safety teams, and EPC contractors. From API-MPMS custody-transfer pressure calibration to portable gas detector bump testing and refinery process-loop verification, our 5 US labs deliver hazardous-area-aware measurement traceability.

Calibration for Oil & Gas

Top calibration disciplines for oil-and-gas / petrochemical customers under API-MPMS / ISA-95.

Repair for Oil & Gas

Factory-trained repair for the process-loop calibrators and gas detectors behind refinery safety.

Sales & Rentals for Oil & Gas

Authorized partner sales and project rentals for oil-and-gas / petrochemical customers.

Compliance & Industry Standards

Techmaster cal certificates satisfy the audit requirements of every major oil-and-gas / petrochemical framework:

API MPMS Chapter 4 proving systems · API MPMS Chapter 11 physical properties · API MPMS Chapter 14 natural gas fluids · API RP 555 process analyzers · API 670 machinery protection · ISA-95 enterprise-control integration · ISA-84 / IEC 61511 SIS for process · OSHA 1910.119 PSM · NFPA 70 NEC Class I Div / Zone · NFPA 86 ovens and furnaces · OSHA / ISEA RP 12-2.3 gas detector bump test · API 521 / 537 · EPA Methods for analyzers

UUTs We Calibrate

Comprehensive list of Unit-Under-Test (UUT) instruments customers in this industry typically send to Techmaster for ISO/IEC 17025 accredited calibration. Click any linked item for a deep-dive article on its calibration procedure, uncertainty budget, and typical failure modes.

Need API-MPMS custody-transfer cal, on-site gas detector bump test, or refinery loop verification?

Our oil-and-gas specialists handle API-MPMS custody-transfer pressure and flow calibration, on-site portable gas detector bump testing per OSHA / ISEA RP 12-2.3, refinery process-loop verification with Beamex documenting calibrators, and Class I Div hazardous-area instrument intake.

Frequently Asked Questions

Common questions about Techmaster oil, gas, and petrochemical test equipment services.

Are your cal certs accepted on API-MPMS custody-transfer audits?
Yes. Our ANAB-accredited ISO/IEC 17025 cal certs are accepted by ExxonMobil, Chevron, Shell, BP, Marathon, Phillips 66, and Valero custody-transfer measurement teams — with traceability documented to API MPMS Chapter 4 / 11 / 14 requirements.
Do you support on-site portable gas detector bump testing?
Yes. Our field engineers perform bump testing and full span calibration of Industrial Scientific, RAE Systems, Honeywell BW, and MSA Altair gas detectors with NIST-traceable cylinder gases (LEL, H2S, CO, O2, VOC) per OSHA / ISEA RP 12-2.3.
Can you support refinery process-loop calibration with documenting calibrators?
Yes. Our engineers carry Beamex MC6 / MC2 documenting calibrators, Fluke 754, and Druck DPI 612 / 620 pressure calibrators for on-site refinery loop verification — with full uncertainty budgets and 21 CFR 11-aligned electronic records.
Do you handle Class I Division / Zone hazardous-area instruments?
Yes. Hazardous-area instrument intake is supported with proper segregation and intrinsic-safety verification. Our quality program documents transit conditions and certification per NEC / IEC ATEX / IECEx as required.
Which Techmaster locations serve oil-and-gas customers?
San Antonio TX (Houston / Permian Basin proximity), Orlando FL (Gulf-Coast refineries), Vista CA, and Santa Clara CA. On-site CONUS for offshore platform and remote-site cal campaigns.

Ready for an oil-and-gas calibration proposal?

Send us your instrument list, hazardous-area classifications, and API / ISA target standards. We will respond within one business day with a scope proposal.